Registry - Project Details

Kores Kocadag Wind Power Project, Turkey(ID: 103000000002326)

Account Holder
Description
The 17.5 MW Wind Power Project shall be built on the Cesme peninsula in the Izmir province. It is planned to built 7 turbines with 2.5 MW capacity each.While energy production of the plant cannot exceed 15 MWe at any time, the planned installed capacity is 17.5 MW.
Documents

CategoryStandardProject TypeAdditional CertificationLinked
CarbonGold StandardWindNo
Izmir,Turkey
For more information about Markit, please contact us at any of our regional offices
Copyright © 2019  Markit Group Limited. ALL DATA PROVIDED AS IS, WITH NO WARRANTIES. All rights reserved.
Data may not be reproduced or redistributed in any form, except as expressly authorized by Markit Group Limited.