Registry - Project Details

Kores Kocadag Wind Power Project, Turkey(ID: 103000000002326)

Account Holder
Description
The 17.5 MW Wind Power Project shall be built on the Cesme peninsula in the Izmir province. It is planned to built 7 turbines with 2.5 MW capacity each.While energy production of the plant cannot exceed 15 MWe at any time, the planned installed capacity is 17.5 MW.
Documents

© 2019  IHS Markit. All rights reserved. Reproduction in whole or part without permission is prohibited.

IHS Markit